We are constructing and installing new AC/DC converter equipment at Benmore (South Island) and Haywards (North Island) substations to increase capacity of the high voltage direct current (HVDC) inter-island link.
The new converter equipment, known as Pole 3, replaces the Pole 1 equipment at both substations with state-of-the-art thyristor valve units. The HVDC Pole 3 project, worth up to $672 million, will be commissioned in early 2013, find out more.
Watch a video overview of the project