Wairakei to Whakamaru Replacement Transmission Line Project

Overview

What we're doing

Transpower is carrying out a project to build a new double circuit 220 kV transmission line between Wairakei and Whakamaru to help connect more generation being built in the area.

As part of this project, the existing Wairakei to Whakamaru B line (via Poihipi Rd) will be decommissioned and removed.

Why we're doing it

This project will provide sufficient capacity for the foreseeable future.

Project Timeline

01.12.2009
Electricity Commission Approval
01.08.2010
Determine transmission line route
01.03.2011
Design Solution
01.12.2011
Award Tenders
01.08.2012
Construction
01.04.2013
Commissioning

Tendering

Tendering for this project (if any) will be made through either the GETS or Transpower website. Register at both these sites to be notified of any open tender release.

Project Contacts

gridupgrade@transpower.co.nz
  • Project Reference:
    WKM-WRK-TRAN-DEV-01
  • Region:
    Backbone
  • Status:
    Committed
  • Cost Bracket:
    F "$100 - $300 million"
  • Timing:
    2013