1. Project description/overview

2. Process in selecting the 400kV capable line option Process in selecting the 400kV capable line option Process in selecting the 400kV capable line option

3. System planning

4. ACRE model and approach to easement selection and tower move process

5. Environmental constraints identification during transmission option analysis, Pakuranga and Brownhill road substations cable route options

file type icon

Steven Taylor [2.1MB]

6. Route and Site Selection

7. Overview: transmission line engineering

8. Line Rating, Conductor selection, EMF, insulation design, lightening performance, RFI/NZECP

9. Transmission line engineering, design, structures and foundations

10. Underground cables

11. Substations

12. Magnetic field interference

13. EMI/EPR

14. Geotechnical and civil works

15. Construction processes and management: cables

16. Overview of construction processes: lines

file type icon

Peter Rasul [2.6MB]

17. Construction processes and management: lines

18. Construction processes: substations

19. Transport/traffic issues

20. Consultation/social impacts

21. Social impact peer review

22. Tangata Whenua consultation and cultural issues

file type icon

Buddy Mikaere [6.2MB]

23. Tangata Whenua consultation

24. Tangata Whenua consultation

25. Property Acquisition and landowner liaison

26. Landscape/visual effects

27. Landscape/visual effects peer review

28. Terrestrial ecological impacts

29. Water quality and aquatic ecology impacts

30. Groundwater issues

31. Archaeological/heritage issues

32. Tourism and Recreational issues

33. Aviation risks relative to Ardmore Airport

34. Agricultural issues

35. Aerial Top-dressing

36. Noise

37. Noise review and conditions

38. Forestry management issues/risks

39. EMF and health standard issues

40. EMF and human health issues (epidemiology)

41. EMF and human health (biophysics)

42. EMP and human health issues

file type icon

Eric Van Rongen [2.0MB]

43. Animal health issues

44. Organic farming issues

45. Planning: Resource Management Act Analysis, Overhead Transmission Line, Brownhill Substation and Whakamaru and Whakamaru North Substation

46. Planning: Notices of requirement for Otahuhu Substation and Otahuhu to Brownhill cable route

47. Planning: Notices of Requirement for the Pakuranga Substation and Pakuranga to Brownhill Underground Cable Route and resource consents