1. Project description/overview
John Nicholas Oliver Coad [873kB]
2. Process in selecting the 400kV capable line option Process in selecting the 400kV capable line option Process in selecting the 400kV capable line option
Timothy Andrew George [1.2MB]
3. System planning
David Edward Boyle [8.8MB]
4. ACRE model and approach to easement selection and tower move process
Dougall James Campbell [4.0MB]
5. Environmental constraints identification during transmission option analysis, Pakuranga and Brownhill road substations cable route options
Steven Taylor [2.1MB]
6. Route and Site Selection
Sylvia Jean Allan [6.5MB]
7. Overview: transmission line engineering
Roy John Clement Noble [12.4MB]
8. Line Rating, Conductor selection, EMF, insulation design, lightening performance, RFI/NZECP
Milind Vishnu Khot [10.5MB]
9. Transmission line engineering, design, structures and foundations
Robert George Lake [4.3MB]
10. Underground cables
Hugh Robert Kelsey Wildash [4.6MB]
11. Substations
Robert John Deller [4.5MB]
12. Magnetic field interference
Ross Doyle Cooper [3.9MB]
13. EMI/EPR
Anthony Cyrus Mitton [1.8MB]
14. Geotechnical and civil works
David Andrew Burns [9.3MB]
15. Construction processes and management: cables
Richard Edward Joyce [1.7MB]
16. Overview of construction processes: lines
Peter Rasul [2.6MB]
17. Construction processes and management: lines
Philip James Patrick [8.6MB]
18. Construction processes: substations
Robert (Bob) Edward Bell [4.1MB]
19. Transport/traffic issues
Glen Malcolm Prince [6.0MB]
20. Consultation/social impacts
Peter Howard Phillips [12.1MB]
21. Social impact peer review
Julie Meade Rose [1.0MB]
22. Tangata Whenua consultation and cultural issues
Buddy Mikaere [6.2MB]
23. Tangata Whenua consultation
Tahi Francis Ngakete [437kB]
24. Tangata Whenua consultation
Helen Glyndwr Hendren [470kB]
25. Property Acquisition and landowner liaison
John Craig Miles [1.4MB]
26. Landscape/visual effects
Gavin Craig Lister [23.9MB]
27. Landscape/visual effects peer review
Dr Michael Lawrence Steven [5.6MB]
28. Terrestrial ecological impacts
Simon Herbert Beale [3.4MB]
29. Water quality and aquatic ecology impacts
David James Cameron [782kB]
30. Groundwater issues
Brian Hugh Kouvelis [417kB]
31. Archaeological/heritage issues
Brent Dale Druskovich [1.4MB]
32. Tourism and Recreational issues
David Alexander Bamford [4.1MB]
33. Aviation risks relative to Ardmore Airport
Rodney Ernest Sullivan [8.9MB]
34. Agricultural issues
Francis John Hall [2.4MB]
35. Aerial Top-dressing
Allan James Nichol [1.2MB]
36. Noise
Graham William Francis Warren [7.0MB]
37. Noise review and conditions
Nigel Robert Lloyd [539kB]
38. Forestry management issues/risks
Michael George Colley [871kB]
39. EMF and health standard issues
Dr David Russell Black [1.3MB]
40. EMF and human health issues (epidemiology)
James Mark Elwood [5.8MB]
41. EMF and human health (biophysics)
Andrew William Wood [1.1MB]
42. EMP and human health issues
Eric Van Rongen [2.0MB]
43. Animal health issues
Kevin (Michael) Rooney [2.2MB]
44. Organic farming issues
James (Kenneth) Allen [300kB]
45. Planning: Resource Management Act Analysis, Overhead Transmission Line, Brownhill Substation and Whakamaru and Whakamaru North Substation
Sylvia Jean Allan (2) [20.3MB]
46. Planning: Notices of requirement for Otahuhu Substation and Otahuhu to Brownhill cable route
Paula Margaret Hunter [3.0MB]
47. Planning: Notices of Requirement for the Pakuranga Substation and Pakuranga to Brownhill Underground Cable Route and resource consents
Annette Tyree McGovern [9.8MB]